this is the house as it was when we bought it (fall 2004)
![]()
here's a shot of the formstone coming off (summer 2006)
![]()
The process: (1) remove formstone, (2) remove paint with chemicals, (3) grind out old mortar joints, (4) repoint joints, (5) seal with silicone
![]()
each time the brick was washed the water was collected and pumped into big drums for disposal
![]()
nearly finished with the main repointing-- the remaining steps for this crew were (6) install brick sills and (7) repair & paint the cornice
![]()
amy scraped and painted the door to the old coal shute
![]()
the window crew came a few weeks later to replace the windows in the front. as you can see, the house was originally built with a big window on the first floor that was closed in at some point
![]()
don't fall outta there! (he did -- and was okay)
![]()
the final product (minus some trimwork around the doors)